Engineering complex shapes for contractor in BIM.
This building is unique due to the human figure, that is half inside, half outside the building. The BIM model provided the possibility to engineer this unusual structure, and helped the contractor immensly to be able to prefabricate various elements.
Client: | Heddes Bouw |
Size: | 5.500 m2 |
Architect: | PBV Architecten |
Builder: | Heddes Bouw |
Link: |