In a supply chain collaboration project an integral engineering in BIM has been realised for the office of demolisher Oranje.

The social driven company Oranje was looking for a new office area. Following their sustainable philosophy, they decided to renovate one of their existing buildings into a brand new office and working area. In collaboration with the various suppliers, an integral BIM model was created in order to speed up the engineering process.

 

Client: Dura Vermeer
Size: 1.250 m2 kantoor
Architect: Wim de Bruijn
Builder: Dura Vermeer (with various others)
Link:

www.oranje-bv.nl