In a supply chain collaboration project an integral engineering in BIM has been realised for the office of demolisher Oranje.
The social driven company Oranje was looking for a new office area. Following their sustainable philosophy, they decided to renovate one of their existing buildings into a brand new office and working area. In collaboration with the various suppliers, an integral BIM model was created in order to speed up the engineering process.
Client: | Dura Vermeer |
Size: | 1.250 m2 kantoor |
Architect: | Wim de Bruijn |
Builder: | Dura Vermeer (with various others) |
Link: |